Buyers in Miami condos now review the building's records before they make an offer, and the association is the source of almost every document they read. Since 2022, Florida law has required structural inspections and reserve studies for buildings three or more stories tall, ended the vote to waive structural reserves, and required most associations to post key records online. Lenders have tightened their own reviews at the same time. The result is that a buyer's agent, attorney and loan officer can each see whether the building is maintained, funded and insured. When those records are complete and current, units are easier to sell. When they are missing or out of date, buyers fill the gap with the worst assumption. This guide goes through each document buyers review, what they look for in it, and what the board controls.

This article is general information about Florida condominium law and mortgage project standards, not legal, lending or accounting advice. Disclosure obligations, records decisions and questionnaire answers should be reviewed with the association's attorney, accountant and reserve professional.

The 60-second version
1
Buyers start with the structure
The milestone inspection or 40-year recertification, and whether any required repairs are finished.
2
Then they compare the SIRS to the budget
They check whether the budget collects what the study recommends. A gap reads as a future special assessment.
3
Their lender reviews the building too
Critical repairs, delinquencies over 15%, low reserve funding and the insurance deductible can each block a conventional loan.
4
The board controls the file
Post on time, keep repair close-out letters, explain gaps in writing, and answer questionnaires from the records.

Who reads the building's file

Four groups review the building on a typical Miami condo sale. Each reads it for a different reason.

More and more buyers also start before any of these people are involved. Free building-report websites such as The Condo Room publish reports on thousands of Miami-Dade condo buildings, built from the association's own filings. A buyer can see the reserves, inspections, insurance and budget history for your building before they ever schedule a showing. That makes the completeness of your records a marketing issue, not only a compliance issue.

Infographic of what Miami condo buyers review in a building's file and what the board keeps ready: the structural record under FS 553.899 and Miami-Dade recertification, the structural integrity reserve study under FS 718.112(2)(g), the budget compared with the study under FS 718.112(2)(f), special assessments and the estoppel certificate under FS 718.116(8) and (10), financial statements under FS 718.111(13) with delinquencies tracked against 15 percent, and the master insurance policy under FS 718.111(11)
The six documents buyers review, and what the board should keep ready for each. Click to zoom.

The structural record

The first thing most buyers check is whether the building is structurally sound and inspected on time. In Miami-Dade there are two separate programs.

The state milestone inspection. Under FS § 553.899, condominium buildings three or more habitable stories tall must have a milestone inspection by December 31 of the year the building reaches 30 years of age, and every 10 years after that. The local enforcement agency may require the first inspection at 25 years based on local conditions such as proximity to salt water. Phase 1 is a visual examination by a licensed engineer or architect. Phase 2 is required when Phase 1 finds substantial structural deterioration, and the repairs it calls for must begin within 365 days of the report. Within 45 days of receiving the report, the association must send the inspector's summary to every owner, post it on the property, and publish the full report and summary on its website if it is required to have one.

The Miami-Dade 40-year recertification. The county's own building recertification program is still widely called the "40-year recertification," but since a 2022 ordinance it starts at 30 years and repeats every 10 years. Coastal condo buildings three or more stories tall, within 3 miles of the coastline and built in 1998 or later, start at 25 years. It covers structural and electrical safety.

What buyers review in detail:

Keep the close-out letter with the report

A Phase 2 report on its own tells a buyer the building had problems. The same report with the engineer's completion letter and the closed permit tells the buyer the problems were fixed. File them together and post them together. Our guide to milestone inspection deadlines and costs covers the timeline.

The structural integrity reserve study

The structural integrity reserve study (SIRS) is the document buyers spend the most time on. Under FS § 718.112(2)(g), buildings three or more habitable stories tall must have one and must redo it at least every 10 years. It covers the roof, structure and load-bearing walls, fireproofing and fire protection, plumbing, electrical systems, waterproofing and exterior painting, windows and exterior doors, and any other item over $25,000 (or the inflation-adjusted amount) whose failure would affect those parts. It must be performed or verified by a licensed engineer or architect, or a reserve specialist or professional reserve analyst certified by the Community Associations Institute or the Association of Professional Reserve Analysts. Within 45 days the association must send the study, or notice that it is available, to every owner.

What buyers review in detail:

  1. The date and the preparer. Whether the study is current and was prepared by a qualified professional.
  2. Percent funded. How much is in reserves compared with what the study says should be there.
  3. The recommended annual contribution. What the association should be collecting each year.
  4. The first large expense. Which component comes due first, in which year, and at what cost.
  5. The funding method. Whether the study uses component (straight-line) funding or pooled funding.

Buyers are increasingly taught to look for these numbers. The Condo Room's buyer guide on reading a SIRS report shows them exactly where percent funded, the recommended contribution and the first expense sit in a real study. It is worth reading as a board, because it is the checklist buyers bring to your documents.

The budget compared with the study

A buyer's next step is to put the adopted budget next to the SIRS. The question is simple: is the association collecting what the study recommends?

Buyers also look back. Before budgets adopted on or after December 31, 2024, owners could vote to waive or reduce reserves. Many Miami buildings did so for years. A buyer who sees a history of waivers expects higher fees or assessments now, as the building catches up.

One more point: the statutory reserve pause. Under FS § 718.112(2)(f)2.e., for budgets adopted on or before December 31, 2028, an association that completed a milestone inspection within the previous 2 calendar years may, with a majority of the total voting interests, pause or reduce reserve contributions for up to two consecutive annual budgets to fund the repairs the inspection recommends. A new SIRS is required before contributions resume. It is legal, but buyers and lenders see the budget as it is. A paused budget shows reserve funding below the study, and below the lender minimum. If the board uses the pause, explain it in writing and keep the repair schedule with the budget. Our SIRS and reserve funding guide covers the rules.

Special assessments and the estoppel certificate

Buyers want to know two things about special assessments: what has already been approved, and what is likely to come.

What has been approved appears on the estoppel certificate. Under FS § 718.116(8), the association must issue it within 10 business days of a request. It must itemize all assessments, special assessments and other amounts owed on the unit, and those scheduled to become due while the certificate is in effect (30 days, or 35 if mailed). The statute does not expressly require listing an assessment that has been discussed but not yet levied. The buyer becomes jointly liable with the seller for unpaid assessments under FS § 718.116(1). See our guide to estoppel certificates.

What is likely to come is found in board minutes and agendas. Buyers and their agents read the last 12 months of minutes looking for engineers' reports, bid packages, loan discussions or a project named but not yet funded. Under FS § 718.116(10), the notice of a special assessment must state its specific purpose. Clear, specific minutes help. A buyer who sees a concrete restoration project with a scope, a cost and a funding plan is less worried than one who sees a vague line about "structural issues."

Try Mosaic alongside your current software. No Risk!

See how Mosaic works
Always Human Support • Florida Built • Easy Cancellation

Financial statements and delinquencies

Buyers and lenders read the year-end financial statements to confirm the budget is real. Under FS § 718.111(13), the type of report depends on the association's total annual revenue: a cash receipts and expenditures report under $150,000, compiled statements from $150,000, reviewed statements from $300,000, and audited statements at $500,000 or more. Owners may vote to use a lower tier, but not in consecutive years. The report is due within 90 days after the fiscal year ends. See our guide to reviews versus audits.

What buyers review in detail:

The master insurance policy

Under FS § 718.111(11), coverage may be based on replacement cost as determined by an independent insurance appraisal, and the replacement cost must be determined at least once every 3 years. Buyers review three things:

Keep the current declarations page, the per-unit deductible calculation and the most recent replacement cost appraisal together. Insurance agents ask for them on almost every sale. Our insurance renewal playbook covers the renewal itself.

The lender's project review

For a conventional loan, the lender reviews the building against Fannie Mae or Freddie Mac standards. It usually sends the association a condominium project questionnaire, such as Fannie Mae Form 1076. The lender must also review any structural or mechanical inspection from the last 3 years, and the purpose and status of any special assessment. Fannie Mae's ineligible project rules list the conditions that block a loan, including:

No Florida statute requires the association to complete a lender questionnaire. In practice, not answering makes units harder to sell. Designate one person, usually the manager or the association attorney, to answer strictly from the official records, and keep a copy of every questionnaire returned. If the building appears on an ineligible list, see our guide to the Fannie Mae ineligible list.

Where buyers find all of this

Buyers get the building's records from four places. The board controls the quality of every one.

  1. The resale disclosure package. Under FS § 718.503(2), the selling owner must give the buyer the declaration, articles, bylaws and rules, the annual financial statement and budget, the inspector-prepared summary of any milestone inspection, the most recent SIRS (or a statement that none has been completed), any turnover inspection report, the frequently asked questions and answers document, and the DBPR governance form. Unless the buyer received them more than 7 days before signing, the buyer may cancel within 7 days, excluding weekends and legal holidays. The owner gets these documents from the association.
  2. The association website. Under FS § 718.111(12)(g), since January 1, 2026, associations with 25 or more units must post key records on a website or app within 30 days, including the budget, financial reports, 12 months of approved minutes, structural inspection reports, the SIRS and building permits for ongoing or planned work. Insurance policies are official records but are not on the website list. See our website compliance guide.
  3. Official records requests by the seller. Owners can inspect the official records and must be given access within 10 working days. See our guide to records requests.
  4. Public building reports. Sites like The Condo Room compile filings into one page per building. Their Miami building directory covers more than 3,000 Miami-Dade buildings. A report like the one for the Towers of Key Biscayne shows what a complete record looks like to a buyer: a current SIRS, a budget that funds it, inspections on file and the insurance summary in one place.
Screenshot of The Condo Room's free building report for Oceana Key Biscayne, a 153-residence Miami condo built in 2014 at 360 Ocean Drive, showing the report header and the 'What the SIRS says' panel: the reserve study reports the fund is 100% funded as of January 1, 2025, with $0 special assessments required and a low risk of special assessment
What a buyer sees before a showing: the public report for Oceana Key Biscayne on The Condo Room, leading with the reserve study's finding. Click to zoom.
Infographic of the four places buyers find a Miami condo building's records: the resale disclosure package under FS 718.503(2), the association website required for 25 or more units under FS 718.111(12)(g) with postings within 30 days, an official records request answered within 10 working days under FS 718.111(12)(c), and third-party public building reports, all of which start with the association's own records
Every route a buyer uses starts with the association's own records. Click to zoom.
Look up your own building

Before your next budget meeting, look up your building's public report the way a buyer would. If a document is missing or out of date there, it is usually because it is missing or out of date in the association's posted records. Fix the source.

A board checklist

These steps keep the building's file complete. Most are things the manager can track on a calendar.

  1. Post on time. Post each required document on the association website within 30 days, and replace superseded versions.
  2. Pair every report with its outcome. File and post Phase 2 reports with the engineer's completion letter and closed permits.
  3. Keep the SIRS current. Calendar the 10-year deadline. Ask the reserve professional whether the study also meets lender reserve-study requirements.
  4. Explain the budget against the study. Add a short note on the funding method, any pause or loan, and the repair schedule it pays for.
  5. Write specific minutes. Record the scope, cost and funding plan of major projects.
  6. Track delinquencies against 15%. Review the count monthly, separately for each special assessment.
  7. Keep an insurance file. Declarations page, per-unit deductible calculation and the latest replacement cost appraisal, ready to send.
  8. Answer questionnaires from the records. One designated person, records only, copies kept.
  9. Issue estoppels on time. Within 10 business days, itemizing everything owed and everything scheduled to come due.

Frequently asked questions

Usually the structural record: the date and result of the milestone inspection or Miami-Dade 40-year recertification, and whether any required Phase 2 repairs are finished. Next they compare the structural integrity reserve study with the adopted budget to see whether the association is collecting what the study recommends. Then they read special assessments, financial statements and the master insurance policy.
The selling owner must give the buyer the most recent SIRS, or a statement that none has been completed, and the inspector-prepared summary of any milestone inspection as part of the resale disclosures in FS 718.503(2). The owner gets them from the association. Associations with 25 or more units must also post the SIRS on their website under FS 718.111(12)(g). In practice the buyer will see it either way, so keep the posted version current.
Post the outcome with the report. Keep the engineer's completion letter, the closed permits and the building department's acceptance with the Phase 2 report, and post them together. If the work is still in progress, post the schedule and the funding plan. Buyers and lenders treat finished, documented repairs very differently from open ones.
Yes. Buyers and lenders read the budget as adopted. A paused budget shows reserve funding below the study and can fall below the lender minimum, which rises to 15 percent of budgeted assessment income for applications received on or after January 4, 2027. Explain the pause in writing, attach the repair schedule it funds, and discuss with the association's attorney and lender contacts before the vote.
No Florida statute requires it, but refusing makes units harder to finance and sell. Designate one person, usually the manager or the association attorney, to answer strictly from the official records, decline to guess about future assessments or litigation, and keep a copy of every questionnaire returned.
Under FS 718.116(8), the estoppel certificate itemizes all assessments, special assessments and other amounts owed on the unit, and those scheduled to become due while the certificate is in effect. It must be issued within 10 business days of a request. The buyer becomes jointly liable with the seller for unpaid assessments, which is why buyers and their attorneys read it closely.
Sites such as The Condo Room compile records about Miami-Dade condo buildings into one report per building, so buyers can review reserves, inspections, insurance and budgets before a showing. The board cannot control what such sites publish, but it controls the underlying records. Keeping the association's posted documents complete and current is the best way to make sure buyers see an accurate picture.

Share this guide